Huebner Creek Enhanced Conveyance NWWC Segment 2 LC 17

  • Location Map

    Location Map

  • Crystal Hill North

    Crystal Hill North

  • Crystall Hill South

    Crystall Hill South

  • image005

    image005

  • Timberhill North

    Timberhill North

  • Timberhill South

    Timberhill South

  • LC17_COSA Crossing 2

    LC17_COSA Crossing 2

  • LC17_COSA Crossing 2_00

    LC17_COSA Crossing 2_00

  • LC17_Section A_00 South

    LC17_Section A_00 South

  • LC17_Section E_Existing Drop_01

    LC17_Section E_Existing Drop_01

  • LC17_Section A_03 Drop Structure

    LC17_Section A_03 Drop Structure

  • LC17_Section D_00

    LC17_Section D_00

Location Map

Location Map

Crystal Hill North

Crystal Hill North

Scope:

The scope of this overall project includes the analysis of Leon Creek starting at Loop 410, and following Leon Creek upstream to Huebner Creek just downstream of Bandera Road. This study is to determine the possible channel improvements and the alternatives to reduce structural flooding both in Leon Valley and the City of San Antonio. Segment II will be from just south of Timberhill Drive upstream to the city limit line between Leon Valley and San Antonio. Channel improvements proposed for this segment include channel widening and realignment in order to reduce the floodplain limits in surrounding residential areas.

Construction Update:

Contractor has completed the sanitary sewer work and is now working on the recycled water line, channel excavation, and the CoSA Hike and Bike Trail.

 
 
Precinct
City
Watershed
Creek
Project Type
2
San Antonio, District 7
Leon Creek
Huebner Creek
Natural Waterway Conveyance

Precinct
2

City
San Antonio, District 7

Watershed
Leon Creek

Creek
Huebner Creek

Project Type
Natural Waterway Conveyance
 

Previous Meetings

November 1, 2013

February 15, 2011

May 6, 2008

 

Comments & Questions Form






Please answer the simple question below to help us avoid spam: