French Creek Trib NWWC – Environmental LC 23

  • LC23 Circle S Drive LWC

    LC23 Circle S Drive LWC

  • LC23 Diamond K LWC

    LC23 Diamond K LWC

LC23 Circle S Drive LWC

LC23 Circle S Drive LWC

Scope:

The intent of this project is to remove multiple residential properties from the 1% annual chance (100-year) storm event floodplain, and to eliminate multiple low water crossings in the Evans Valley Subdivision and at the intersection of Diamond K and Bar X Trail within the city limits of Helotes, Texas. This project will utilize natural channel design elements to make improvements to French Creek and associated tributaries to remove homes in the Cedar Springs and Evans Valley subdivisions from the floodplain. This project is located over the Edward Aquifer Recharge Zone.

Project Documents:
LC23_121813_FEMA LOMR Ltr_Website Version_Final

October 8, 2015 Community Meeting Presentation

 
 
Precinct
City
Watershed
Creek
Project Type
3
Helotes
Leon Creek
French Creek
Natural Waterway Conveyance

Precinct
3

City
Helotes

Watershed
Leon Creek

Creek
French Creek

Project Type
Natural Waterway Conveyance
 

Previous Meetings

December 14, 2016

October 8, 2015

August 21, 2012

February 21, 2012

November 2, 2011

July 28, 2011

 

Comments & Questions Form






Please answer the simple question below to help us avoid spam: