Bexar County Flood Control Projects

Click on a project name to view the project PDF.  Click on a column title to sort projects.

Project Name ID Watershed Precinct Status
Balcones Heights RSWF (Woodlawn) SA 38 San Antonio River 3 On Hold
Broadway Drainage Improvements SA 42 San Antonio River 2 Negotiation
Calaveras 8 Rehabilitation SA 41 San Antonio River 4 Final Design Negotiation
Chimenea Creek LC 14 Leon Creek 3 On Hold
Evans Road SC 2 Salado Creek 3 Detailed Design
Hausman Drainage Project Phase I LC 9 Leon Creek 3 Detailed Design
High Water Detection System Phase I CW 1 Countywide ALL Construction
Huebner Creek Enhanced Conveyance NWWC LC 17 Leon Creek 2 Phase I Negotiation/Detail Design
Huebner Creek RSWF at Prue Road LC 15 Leon Creek 3 Preliminary Design
Ingram Road LWC LC 8 Leon Creek 2 Negotiation/Detailed Design
Jungman Road at Medina River MR 3A Medina River 1 Completed
Laddie Place RSWF Phase III SA 2 San Antonio River 2 Preliminary Design
Live Oak Slough-Benton City Road Improvements MR 13 Medina River 1 Completed
Live Oak Slough-Overflow Control MR 27 Medina River 1 Preliminary Design
Local Project - Briggs Road MR 28 Medina River 1 Intermediate Design
Local Project - Luckey Road MR 29 Medina River 1 Preliminary Design
Local Project - Whisper Creek LC 19 Leon Creek 3 Preliminary Design
Martinez Dam 6A CB 17 Cibolo Creek 4 Completed
Menger Road SC 12 Salado Creek 3 Preliminary Design
Mid-Beitel Creek Channel Restoration SC 5 Salado Creek 4 Permitting
Olmos Dam SA 33 San Antonio River 2 Final Design
Perrin Beitel Bridge Expansion SC 9 Salado Creek 4 Preliminary Design
Rock Creek NWWC/Outfall SA 6 San Antonio River 3 Preliminary Design
Roland Avenue Bridge SC 18 Salado Creek 4 Negotiation/Detailed Design
Rosillo Creek RSWF SC 15 Salado Creek 4 Negotiation/Detailed Design
San Pedro Huisache Phase II SA 22 San Antonio River 2 Detailed Design
Schaefer Road Drainage Phase I CB 19 Cibolo Creek 4 Detailed Design
Shane Road Low Water Crossing SA 4 San Antonio River 1 Negotiation/Detailed Design
Shepherd Road at Elm Creek & Black Hill Branch MR 8 Medina River 1 Final Design
Sixmile Creek Drainage Improvements SA 43 San Antonio River 1 Negotiation