Sixmile Creek Drainage Improvements - CCR 3 (SA 43 - CCR 3)

print version comment

Scope:
The overall scope for this project includes the analysis of Sixmile Creek starting downstream of Roosevelt Avenue and continuing upstream to IH35. The overall project will entail channel and bridge improvements between Hutchins Place and Roosevelt Avenue to reduce the structural flooding along Six Mile Creek. The intent of the project is to reduce the floodplain in the residential areas and provide for unflooded access across South Flores during the 100-year ultimate development storm event.  This segment of the project is to reconstruct the existing channel from the new South Flores Street bridge to Ashley Road (approximately 6,500 feet).

Upcoming Meetings There are no upcoming meetings. Check back soon.

Consultant:
CDM Smith

Contractor:
TBD
 

Construction Cost:
$8,000,000 (estimated)

Advertise:
July
2015 (estimated)

Construction Start:
October 2015 (estimated)

Construction End:
October 2016 (estimated)

Project Status


Inactive

On Hold

Project
Initiation
Preliminary
Design
Detailed
Design
Construction Project
Complete
project status project status project status project status project status

Precinct City Watershed Creek Name Project Type
1 San Antonio, District 3 Upper San Antonio River Sixmile Creek Regional Drainage Improvements