Find the latest news, updates and announcements relating to Bexar County Flood Control Capital Improvement Projects.
> Barbara Drive Drainage
Bexar County Flood Control Projects
Barbara Drive Drainage (SA 3)
print version comment
|
|
Scope:
The scope of this project is to provide unflooded access during a 1% annual chance (100-year) storm event along McCullough Ave at an existing low water crossing near Barbara Drive. The project may include replacement of the concrete lined open channel east of McCullough Ave and the installation of an underground drainage system beneath Barbara Drive west of McCullough Ave.
Upcoming Meetings
There are no upcoming meetings. Check back soon.
Consultant:
Civil Engineering Consultants
Contractor:
TBD
Construction Cost:
$8,500,000 (estimated)
Advertise:
TBD
Construction Start:
TBD
Construction End:
TBD
Project Status
Inactive
On Hold
| Project Initiation |
Preliminary Design |
Detailed Design |
Construction | Project Complete |
| project status | project status | project status | project status | project status |
| Precinct | City | Watershed | Creek Name | Project Type |
|---|---|---|---|---|
| 2 | San Antonio, District 1 | Upper San Antonio River | Tributary A to Airport Tributary | Drainage Improvements |
Previous Meetings
Shearer Hills-Ridgeview Neighborhood Association
Venue: School of Excellence | Date: 2011-10-27 | Contact: info@bexarfloodcontrol.org
Barbara Drive NA Meeting
Venue: School of Excellence in Education | Date: 2012-03-22 | Contact: info@bexarfloodcontrol.org

