Find the latest news, updates and announcements relating to Bexar County Flood Control Capital Improvement Projects.
> Real Road Low Water Crossing
Bexar County Flood Control Projects
Real Road Low Water Crossing (SA 17)
print version comment
|
Score:
This project will replace the existing low water crossing at Real Road and Chupaderas Creek with a
structure capable of passing a 1‐percent ‐chance (100 year) storm without overtopping the road.
In addition, Real Road will be reconstructed, ditches along Real Road will be re‐graded, the
channels upstream and downstream will be re‐graded and utilities relocated as needed.
Upcoming Meetings
There are no upcoming meetings. Check back soon.
Consultant:
CAS Consulting Engineers
Contractor:
TBD
Construction Cost:
$750,000
Advertise:
October 2013
Construction Start:
TBD
Construction End:
TBD
Project Status
Inactive
On Hold
| Project Initiation |
Preliminary Design |
Detailed Design |
Construction | Project Complete |
| project status | project status | project status | project status | project status |
| Precinct | City | Watershed | Creek Name | Project Type |
|---|---|---|---|---|
| 4 | Upper San Antonio River | Low Water Crossing |
Previous Meetings
Kirkner Road & Real Road Community Meeting
Venue: Heritage Middle School | Date: 2012-11-01 | Contact: info@bexarfloodcontrol.org