Scope:
The project will study the feasibility of keeping the four street crossing structures (Parkway Drive, Oak Knoll Drive, E. Horseshoe Bend, and Majestic Drive) in place with High Water Detection Systems, replacing the failed stilling basin, slowing the flow in the channel, and stabilizing the existing channel using bank stabilization techniques with stream restoration components. Offline detention will also be studied.
The project will study the feasibility of keeping the four street crossing structures (Parkway Drive, Oak Knoll Drive, E. Horseshoe Bend, and Majestic Drive) in place with High Water Detection Systems, replacing the failed stilling basin, slowing the flow in the channel, and stabilizing the existing channel using bank stabilization techniques with stream restoration components. Offline detention will also be studied.
Upcoming Meetings
There are no upcoming meetings. Check back soon.
Consultant:
Freese & Nichols
Contractor:
TBD
Construction Cost:
$940,000 (estimated)
Advertise:
TBD
Construction Start:
TBD
Construction End:
TBD
Project Status
Inactive
On Hold
| Project Initiation |
Preliminary Design |
Detailed Design |
Construction | Project Complete |
| project status | project status | project status | project status | project status |
| Precinct | City | Watershed | Creek Name | Project Type |
|---|---|---|---|---|
| 2 | San Antonio District 7 | Upper San Antonio River | Zarzamora Creek Tributary A | Drainage System |