> Sixmile Creek Drainage Improvements - S. Flores Bridge
Bexar County Flood Control Projects
Sixmile Creek Drainage Improvements - S. Flores Bridge (SA 43)
print version comment
|
|
Scope:
The overall scope for this project includes the analysis of Sixmile Creek starting downstream of Roosevelt Avenue and continuing upstream to IH‐35. The overall project will entail channel and bridge improvements between Hutchins Place and Roosevelt Avenue to reduce the structural flooding along Six Mile Creek. The intent of the project is to reduce the floodplain in the residential areas and provide for unflooded access across South Flores during the 100-year ultimate development storm event. This segment of the project is to reconstruct the existing roadway and bridge at South Flores Street and Sixmile Creek. The project limits are Deely Street (north) and approximately 300’ north of the South Flores and Roosevelt intersection (south).
Construction Updates:
The project is substantially complete and open to traffic.
Consultant:
CDM Smith
Contractor:
Capital Excavation Company
Construction Cost:
$2,518,888.99
Advertise:
November 10, 2011
Construction Start:
February 23, 2012
Construction End:
February 28, 2012
Project Status
Inactive
On Hold
| Project Initiation |
Preliminary Design |
Detailed Design |
Construction | Project Complete |
| project status | project status | project status | project status | project status |
| Precinct | City | Watershed | Creek Name | Project Type |
|---|---|---|---|---|
| 1 | San Antonio, District 3 | Upper San Antonio River | Sixmile Creek | Regional Drainage Improvements |